Forschungsdatenbank

Projektübersicht
Login
Suche

Moeller

Fakultäten » Medizinische Fakultät » Kinderspital Zürich: Medizinische Klinik » Pneumologie » PD Dr. Alexander Möller » Moeller

Current research project

Title / Titel Standardized exercise challenge test for preschool children using the Forced oscillation technique
PDF Abstract (PDF, 14 KB)
Summary / Zusammenfassung Background: Asthma diagnosis and documentation of disease control in preschool children is difficult. Exercise induced bronchoconstriction (EIB) is a common feature of childhood asthma and tests to evaluated EIB are established for school-children. As young preschool-children are not able to cooperate to perform Spirometry, the gold standard of EIB-testing, no standardized test is available for children younger than 6 years.

Aims: To evaluate a standardized EIB-test for children between 3 and 6 years.

Methods: 150 children aged 3 to 6 years are included in a cross-sectional study. 100 with a doctor diagnosed asthma and 50 healthy controls. Children are running together with the investigator in order to achieve submaximal heart rate (>195b/min, Polar®) within 2 minutes and to keep this heart rate for 4 minutes. Lung function is assessed by forced oscillation technique (FOT) and is performed at baseline and at 3, 6, 10, 15 minutes after the run. A positive EIA isdefined as an increase in resistance of ≥30 % in Rrs4-24Hz or 32% in Rrs8Hz to baseline.
Publications / Publikationen no
Keywords / Suchbegriffe EIA test, Asthma, preschool children, Forced oscillation technique
Project leadership and contacts /
Projektleitung und Kontakte
Dr Alexander Moeller, MD (Project Leader) alexander.moeller@kispi.uzh.ch
Dr Demet Inci, MD demet.inci@kispi.uzh.ch
Funding source(s) /
Unterstützt durch
Foundation
Hartmann Mueller Stiftung
In collaboration with /
In Zusammenarbeit mit
Eliane Vrielandt
Department of Pediatric Pulmonology
University Medical Center Groningen
University of Groningen
The Netherlands
e.j.l.e.vrijlandt@bkk.umcg.nl
Netherlands
Duration of Project / Projektdauer Jan 2007 to Apr 2012